Build and operate the "Failure Root Cause Mining for urban planning and mobility" capability for urban planning and mobility. Use when this exact capability is required by autonomous or human-guided missions.
Use failure root cause mining in urban planning and mobility with emphasis on best-in-class standards, precision, and repeatable excellence.
Preflight:
Execution:
Recovery:
Handoff:
run-validation:unit+integration+simulation+regression-baselinerollback:rollback-to-last-stable-baselineapproval-gates:policy-constraint-check+human-approval-routerbudget-guard:resource-pressure-cap