Orchestrates how to plan and scaffold a new project from scratch before implementation. Use this skill to produce end-goal docs, interface contracts, implementation plans, stage checkpoints, and test strategy.
Use this as the parent orchestration skill for scratch-project planning.
Require these before planning implementation:
null/blank semantics)If any are missing, ask the user to provide them before moving forward.
Load and apply subskills in this order:
end-goal-authoringinterface-contract-writingskeleton-auditdirectory-tree-designimplementation-planningstage-checkpoint-planningtest-strategy-contract-firstscope-controldecision-log-maintenancehandoff-readinessreference-integration is optional but should be suggested whenever a
reference folder, prototype, or external architecture resource is present.
Do not start implementation planning until: